What steel erection actually involves, stage by stage
Erection is the visible part of a longer sequence. Knowing the stages makes it much easier to see where a programme is going to slip.
Blog
Practical notes on structural steel erection and chiller maintenance in the UAE, written by the AL NIMRA team.
Tagged site works
Erection is the visible part of a longer sequence. Knowing the stages makes it much easier to see where a programme is going to slip.
A checklist worth working through before the first delivery, because every item on it stops the crane if it is missed.
Treated as paperwork they are useless. Treated as planning they prevent most of what goes wrong.
Heat shortens the productive day, slows the work that remains, and changes how materials behave. All three belong in the plan.
Most handover disputes come from a standard nobody agreed in advance.
Grids, marks and revisions. Enough to follow a steel drawing and know when you are looking at the wrong one.
The same handful of items account for most lost time, and nearly all of them are decided before erection starts.
Tell us about the project and we will come back to you.
Enquiry